QMF Construction was awarded the contract by Haslin Construction to carry out all associated concrete works on the 45000ML off River Storage project in the Nambucca Shire, NSW.

Scope of works on this project included but was not limited to:

STAGE 1 – Intake Tower

  • Designing a formwork system to pour 22m x 3m diameter tower with a 5mm tolerance from the bottom to top of tower
  • Working at heights (scaffolding access to 22m intake/outtake tower and spillway walls)
  • Working with radius formwork (3m radius of intake/outtake tower)

STAGE 2 – Pipe Encasement

  • Designing and constructing a formwork system to hold sloping walls on either side of the pipe encasement whilst encasing 2m diameter pipe in concrete

STAGE 3 – Spillway

  • Designing a formwork system to pour 3 steps (90 cubic metres) of concrete in one pour (A total of 27 steps were poured in 9 pours)
  • Designing a formwork system on sloping walls on spillway
  • Using a walkway system to pour walls
  • Working to a tight construction program (21 days curing time between joints)

Other aspects of the project included:

  • Placement of over 900 tonnes of reinforcement across the project
  • Placement of concrete to the intake/outtake tower
  • The spillway and pipe encasement
  • Supply and design of an engineered formwork system designed to meet the structural design of the intake/outtake tower
  • Working at heights (scaffolding access to 22m intake/outtake tower and spillway walls)
  • Working with conventional and engineered formwork systems
  • Heavy rain area causing continual changes to construction programs in order to meet schedule
  • Cranage of formwork

Works completed July 2014

Project contact: Hugh Miliken – Haslin Construction